Crumlin Hospital
Co. Dublin, Ireland
- Built-up felt flat roofing system
- Zero disruption to delivery of healthcare services
- Essential upgrade works to critical health infrastructure
Scope / Background
The Crumlin Hospital project involved the installation of a built-up flat roofing system within a live healthcare environment. Select was appointed by and worked in close collaboration with Clancy Construction to deliver a durable, thermally efficient, and weather-tight roofing solution over a metal deck. The works formed part of essential hospital upgrades and required careful planning to ensure patient safety, operational continuity, and compliance with healthcare standards. Close coordination with hospital management and the main contractor was critical to delivering the project without disruption.
Process
Select installed a built-up felt flat roofing system designed to meet the performance and durability requirements of a live hospital environment. Works were carefully sequenced to align with hospital operations, with strict controls around access, noise, and safety. All materials were installed in accordance with supplier guidelines and architectural specifications, with ongoing quality inspections carried out throughout the programme. Detailed coordination with Clancy Construction and Children’s Health Ireland ensured smooth delivery and safe site operations.
Results
The roofing works were completed successfully, delivering a robust, compliant, and long-lasting roofing solution for the hospital. The project was delivered safely, on programme, and without disruption to critical healthcare services. The completed roof provides enhanced weather protection, thermal performance, and long-term reliability, supporting the continued operation and future resilience of Crumlin Hospital.