Global Switch, Frankfurt North Data Centre

Frankfurt, Germany

  • 3,000m2 of Brucha Panel cladding installed 
  • 2,500m2 of Bauder roof systems delivered
  • Precise coordination of international logistics and execution of a new build in a location close to major city infrastructure and transport links.

Scope / Background

The Frankfurt North Global Switch data centre project was a cross-functional, collaborative project from our cladding and flat roofing teams involving the installation of Brucha Panel cladding and Bauder roof systems. Select was appointed by and worked closely with Mercury Construction to deliver a weather-tight, thermally efficient roof system on a data centre site operating to a Tier III standard.  With both hybrid dry and water-cooled chillers operating for less than 10% of the year, the building uses an advanced Chiller Assist system to prioritize energy efficiency. The roofing and cladding works required careful planning to ensure compliance with rigorous local (German) and European standards. Through close coordination with the client and contractor, Select ensured operational continuity. This alignment with all parties was crucial to delivering the project without disruption.

Process

Select installed 2,500m2 of Bauder flat roofing systems to the elevations of the facility. Additionally, Select deliver 3,000m2 of Brucha Panel cladding to the exterior of the building. The insulated concrete framed and metal-faced panels were installed with the intent to maintain the data centre’s energy efficiency and met the quality standards needed for the project. The cladding was non-combustible and was structured to allow natural light to enter the building. Select was primarily involved in the first phase of six during the construction process, and by installing the systems in accordance with manufacturer and architectural specifications, Select was able to install both the roofing and cladding with the upmost quality utilising its own internal resources and managing the logistics of both local and international suppliers/vendors.

Results

Select closed out its phase of the project in 2019, with Global Switch’s data centre coming on stream in various phases through 2019 to 2024. This gives a sense of the scale of the overall project. With a tight timeline of six months, Select successfully delivered the roofing and cladding works without interruption. Effective coordination and on-site inspections supported by teams on the ground in Germany and from Ireland ensured smooth delivery and a cohesive roofing and cladding envelope across the entire development. This was accomplished through close collaboration, strict deadlines, and quality-focused solutions whilst managing international logistics. The completed scope of works met all project requirements, and this component of the Frankfurt North campus contains 11,862 sqm of gross space, three data floors, and fully diverse power distribution to technical areas.