InterXion DUB04
Co. Dublin, Ireland
- Operated in a live data centre environment
- Modified bitumen roofing system
- Insulated Europanel systems
Scope / Background
The InterXion DUB04 project involved the delivery of roofing and façade systems to a live data centre environment, where performance, reliability, and compliance were critical. Select was appointed by John Paul Construction to install a fully bonded flat roofing system and insulated external wall panels. The scope required strict adherence to fire safety performance, airtightness, and weather-tightness standards, alongside careful coordination within a sensitive, programme-driven data centre setting.
Process
Select installed a fully bonded modified bitumen roofing system over Aqua Panel cement board, incorporating vapour control layers and high-performance insulation fixed back to the galvanised metal deck. External walls were completed using rigid insulated Europanel systems with non-combustible rock wool insulation, fixed directly to the primary steel structure. All primary structure interfaces were fully lapped and sealed using EPDM vapour barriers. Works were sequenced to ensure uninterrupted progress and compliance with supplier and architectural requirements.
Results
The completed roofing and façade systems meet all data centre performance, fire safety, and durability criteria. Careful coordination and ongoing quality inspections ensured consistent installation standards across the project. The finished envelope contributes to the long-term operational reliability of the InterXion DUB04 facility, delivering a compliant, robust, and low-maintenance solution for this critical infrastructure.