Leprino Foods EU Facility
Portlaoise, Co. Laois, Ireland
- 12,500sqm of Elite Bauder Fully Torch-Bonded Flat Waterproofing
- Kingspan Cold-Store and Architectural Cladding
- Fast-Track Hygienic Infrastructure Logistics
Scope / Background
The delivery of the advanced Leprino Foods EU Facility in Co. Portlaoise represents a landmark achievement in specialized food-grade infrastructure. Selec was appointed to design, deliver, and close out the full high-performance structural waterproofing, insulation, vertical cladding, and architectural flashing package. The facility covers a massive 12,500sqm footprint optimized to produce 45,000 tonnes of world-class mozzarella per annum.
Operating under rigid construction windows, the building envelope had to chase the precast concrete and structural steel frame erection. The primary objective was to rapidly dry-in the structure to protect advanced processing equipment being imported and installed on tight schedules. Because the plant operates under strict FDA and BRC food safety standards, the envelope required 100% zero-leak tolerances, superior airtightness, and uncompromising thermal consistency. To achieve this safely, Select integrated continuous on-site safety management directly into the daily trade workflows.
Process
Select engineered a rigorous, multi-layered roof and cladding strategy tailored explicitly to withstand the extreme environmental, thermal, and hygienic constraints of a world-class dairy processing facility. For the elastomeric roof build-up, the concrete surfaces were treated with Bauder Quick Dry Primer. Then, Select specialists torch-applied Bauder G4E underlay, followed by heavyweight Bauder K5K bitumen capsheet for an unbreakable, fully bonded weatherproofing core. High-performance insulation layers were then bonded to achieve an exceptional thermal U-value, drastically reducing internal condensation risks.
Concurrently, vertical facades were wrapped in architectural insulated cladding panels to complete the building envelope, and custom-fabricated valley gutters were installed to manage massive storm-water runoffs. This was all made possible through careful logistical sequencing: material drops and crane rigging were mapped via strict, phased logistics plans to protect surrounding subgrades. Select also scaled its field workforce dynamically to ensure smooth integration with simultaneous internal mechanical and electrical fit-outs.
Results
Select completed its comprehensive scope within strict contract deadlines and budgeted milestones, executing the technical structural installation with zero operational downtime and a flawless safety record. By rapid drying-in of the 12,500sqm structure, Select played a vital role in keeping the €130 million facility on track for its technical equipment commissioning windows.
The completed envelope achieved exceptional airtightness and technical performance parameters, successfully supporting the climate-control configurations required for FDA and BRC cleanroom processing. Backed by a comprehensive, long-term system guarantee, the robust hot-melt roof and vertical cladding assembly significantly optimizes the processing plant’s total energy footprint. This project reinforces Select Roofing and Cladding’s specialized capability and technical competence in delivering high-consequence, fast-track industrial infrastructure for the international food and beverage manufacturing sector.