Mountpark Logistics Campus (Units A-G)

Baldonnell, County Dublin, Ireland

  • 130,000sqm+ of Premium Commercial Flat Roofing and Cladding
  • Integrated Work-at-Height Safety Infrastructure
  • Unified Group Delivery Model

Scope / Background

The Mountpark Logistics Campus stands as one of Ireland’s premier master-planned logistics environments, spanning roughly 1.4 million square feet of high-spec distribution units hosting tier-one global tenants such as Amazon, DSV, and Rexel. Select was appointed alongside leading main contractors to design, fabricate, and install the complete roofing-associated envelope packages for a bundle of mega-units across the campus. Given the scale of these facilities, the building envelopes required exceptional thermal U-values, siphon drainage integration, and airtightness parameters optimized for large-volume climate tracking.

To maximize project efficiency and ensure safe future roof management, Select Access was brought in concurrently. Select Access engineered the building’s safety layouts directly into the initial roofing drawings, allowing structural anchor points, access systems, and edge protection to be installed alongside the primary roofing layers. This strategy preserved the structural warranty and immediately ensured compliance with Irish and European work-at-height safety regulations.

Process

This project combined large-scale roofing, cladding, and permanent access installations across multiple logistics units. Select installed high-performance built-up roofing systems over structural steel decks alongside deep-profile architectural wall cladding to rapidly enclose the buildings. High-capacity valley gutters and bespoke heavy-gauge aluminium flashings, fabricated in-house, were designed to manage extensive roof drainage.

Select Access engineered EN 795-compliant cable lifeline systems to provide safe maintenance access to roof plant and roof lights. Freestanding and fixed guardrails, aluminium step-overs, walkways, and caged ladders created protected access routes while preventing damage to the new roof membranes. Careful logistics planning, including pre-sorted materials, mobile cranes, and telehandlers, enabled roofing and safety teams to work simultaneously, maintaining programme efficiency and safe operations across the expansive construction site.

Results

The project team delivered the Mountpark industrial bundle within strict budget parameters and ahead of overall project milestones, ensuring the facilities were completely watertight for rapid interior layout fit-outs. By consolidating the building envelope and safety packages under The Select Group, the client benefited from a single point of professional accountability. This approach eliminated scheduling delays and preserved the complete system warranty from structural deck to lifeline anchor.

The completed logistics units achieved superior airtightness and insulation performance, directly supporting the campus’s sustainable design and BREEAM building goals. Every fallback asset, lifeline, guardrail, and step-over system installed by Select Access was fully load-tested, certified, and documented in the building safety file. This project highlights Select’s premier capability to deliver large-scale commercial roofing alongside turn-key height safety systems for major international logistics networks.