Select Roofing delivers Roofing, Cladding, and Flashings solutions for a full Data Centre Campus in Dublin. The site includes eight data halls and two energy centres and has been delivered in partnership with Winthrop Technologies. 

Key Project Facts

  • Total Roofing 26,000m2
  • Total Cladding 20,000m2
  • Materials Hot-melt waterproofing system, build-up felt waterproofing system, Kingspan Wall panel, Eurobond Wall Panel

Select Roofing is pleased to announce our recent work on one of Dublin’s latest Data Centre campus’. Partnering with Winthrop Technologies, we delivered comprehensive roofing and cladding solutions for four key facilities on-site, including two data centre buildings consisting of eight data halls.

Over the past year, we have provided these data centre buildings and energy stations with advanced weatherproofing, fire resistance, and energy efficiency through our roofing and cladding systems.

Extensive Roofing and Cladding Installation

Our team installed 26,000m² build-up waterproof roofing systems to data centres. This system helps protect the technology and equipment inside from moisture and temperature fluctuations. This high-performance roofing adds reliability, longevity, and energy efficiency to each building.

In addition, the cladding enhances the facility’s appearance, adding sleek and consistent finishes that fit the architectural design.

Select Roofing Resources

During the peak of site activity when all buildings were under construction simultaneously, Select Roofing had over 70 personnel on site. These included decking crews, roofing crews, cladding crews, and logistics operatives as well as a full-time EHS Manager on site.

With the project nearing completion, 10 operatives and our Project Manager remain on site to complete the project to hand over to the client. 

Precision Flashings and Cappings for Added Protection

In addition to roofing and cladding, our in-house fabrication team provided aluminium flashing and capping elements to secure every edge and corner of these high-tech buildings. These elements were also powder-coated to match the RAL colours of the building. These components protect against moisture and seal each area to prevent water ingress.

Partnership with Winthrop Technologies

Working closely with Winthrop Technologies, our team maintained high standards throughout the project. This partnership ensured seamless communication and smooth coordination at every project phase. Our team worked efficiently to complete this project within scope, meeting the high standards required for data centre environments.

This project demonstrates our dedication to delivering projects in line with ISO 9001, 45001, and 14001 standards. We deliver data centre roofing and cladding solutions safely, reliably, and sustainably.